POM
Funding Projections
Funding Projections

There is a dynamic relationship between COLS, Program Standards, and annual CNIC guidance. These inputs are used to define the funding requirements as shown in the graphic. The following are major steps in the POM process, which result in funding requirements:

  • The POM Prep tool calculates funding requirements for both modeled and non-modeled Programs at each of the COLS levels
  • Funding requirements are recorded in the POM to a specific Special Interest Code (SIC)
  • CNIC Program Manager determines the COLS level to be attained based on system-wide funding
  • The funding an Installation receives will be at the prescribed COLS level
  • FFR Programs deliver outputs (services and products) commensurate with that level of funding